Client’s goal was to create a first floor primary suite
We had to remove an existing screened in porch and deck along with a past small kitchen bump out addition.
This gave us room to build an office, walk thru closest and bathroom that accommodated grab bars and a curb-less shower. The primary bedroom walked out to a large screened in covered deck.
The existing siding was faded and could not be matched so we installed all new siding through out the home.
The existing HVAC system was older and instead of adding a new separate system we installed one that could handle the new addition and existing house.